image RSS Icon
corPrinterIcon Email page link
 
Building Permits

Building permit(s) shall be obtained prior to:
1. Construction, alteration, enlargement, repair or moving a structure larger than 120 square feet.
2. Demolition of a structure,
3. Change of occupancy of a structure, or
4. Moving a lot line which effects the required fire rating of an exterior wall of a structure.

See Frequently Asked Questions for work exempt from building permits.

Construction documents prepared by a licensed design professional may be required to be submitted with permit application. See Frequently Asked Building Questions for when and why construction documents are required.

For a complete fee schedule return to City of Rockford home page, select Code of Ordinances and use advanced search for both words ‘fee schedule’ or see fee schedule

Building Permits are required for any and all structures larger than 120 square feet that are being constructed, altered, enlarged, repaired, moved; having a change of occupancy; or having a lot line moved which affects the required fire rating of an exterior wall.

Building Permits are required FOR ALL ROOFING WORK as required by State Law.  NOTE: roofing contractors are required to obtain a license from the State of Illinois Department of Professional Regulation.  Visit the Illinois Department of Financial & Professional Regulation for more information.

 

Ice Barrier Requirements Clarification Memo for Residential Reroofing Projects


Building Contractor Licenses

1. General contractors are not required to be licensed.
2. Roofing contractors are required to obtain a license from the State of Illinois Department of Professional Regulation License Lookup
3. Tent Erectors are required to obtain an annual license from the City of Rockford Building Department (815)-987-5550.
4. Outdoor Advertiser’s (Outdoor sign contractors) are required to obtain an annual license from the City of Rockford Finance Department,  Revenue Section (815)-987-5516.
5. Bed and Breakfast Establishments are required to obtain and renew and annual license to operate.



Building Inspections

Permits must be posted where visible from the address street or at the primary entrance to the structure before any work begins. No inspection will be performed without the posting of permit. Inspections must be requested 1 full business day or 24 hours in advance.
1.  Lowest floor elevation – certification following excavation and prior to any other work when structure is located in flood hazard area or when requested by Public Works Department.
2.  Footing or Foundation – following excavations and after forms and any reinforcing steel are in place and prior to pouring of concrete.
3.  Damproofing and Drainage Tiles – following completion of foundation and prior to backfilling of foundation.
4.  Structural/Building Framing – following completion of framing and all other trade rough-in inspections and prior to insulating or covering of wall, ceiling or roof framing
5.  OPTIONAL Insulation – following installation of insulation and all doors and windows in the building’s thermal envelope.
6.  OPTIONAL Lath and Plaster Board – following lath or gypsum board installation of plaster or joint compound FOR FIRE RATED ASSEMBLIES
7.  Final – following completion and passing of all other trade/division final inspections. Upon passing of this inspection a Certificate of Occupancy will be issued for new construction at each address. A Certificate of Final inspection may be issued for addition, change of occupancy or alteration projects if requested or at the discretion of the department.



Page last updated: 5/6/2013 11:08:06 AM

Permits | Report a Problem | Employment | Contact Us

Special thanks to Jason Rotello and Tamika Jones for contributing images for the City of Rockford website.